BACK TO LOG

DATE

PROCESS

HOURS

CATEGORY

01/10/02

Began construction of vertical stabilizer

1.0

tail

DETAIL:

Using the spar stock I milled last week, I began to lay out the outline of the vert. stab. over the plans.  Once again I used the "wedge clamp" method to hold the assembly together.  

 

PICTURES:


Vertical Stabilizer layed up over the plans


Lower front corner of vertical stabilizer


Top of vertical stabilizer

BACK TO LOG