|
|
|||
|
DATE |
PROCESS |
HOURS |
CATEGORY |
|
01/10/02 |
Began construction of vertical stabilizer |
1.0 |
tail |
|
DETAIL: |
|||
|
Using the spar stock I milled last week, I began to lay out the outline of the vert. stab. over the plans. Once again I used the "wedge clamp" method to hold the assembly together.
|
|||
| PICTURES: | |||
|
|
|||
| BACK TO LOG | |||