|
|
|||
|
DATE |
PROCESS |
HOURS |
CATEGORY |
|
01/09/02 |
Finished horiz. stabilizer! Began milling parts for vertical |
1.6 |
tail |
|
DETAIL: |
|||
|
Finished up the horizontal stabilizer. Looks great! Just needs a finish sanding and varnished. Started milling out the 1/8" dado's for the plywood plates where the hinges bolt through the rear spar of the vertical stab. I then drilled 1/4" holes into the spars where the plywood plates were. The holes are for the eyebolt hinges.
|
|||
| PICTURES: | |||
|
|
|||
| BACK TO LOG | |||