|
|
|||
|
DATE |
PROCESS |
HOURS |
CATEGORY |
|
04/28/02 |
Control stick assembly test fit & sandblast L.G. |
4.0 |
fuselage |
|
DETAIL: |
|||
|
I pulled the control stick assembly from GN-1 no.2 and test fit it into GN-1 no.1. I'll have to do some lengthening of the tube to get the stick were I like it but overall a nice fit. I'm going to sandblast it and the rudder pedal assemblies and have them powder coated silver. I also sandblasted the landing gear legs. Sand blasting is the way to go! Takes paint off in no time. I had both legs done in less than 40 minutes. I'm going to have them powder coated white.
|
|||
| PICTURES: | |||
|
|
|||
| BACK TO LOG | |||