DATE |
PROCESS |
HOURS |
CATEGORY |
|
04/22/02 |
Finished up bottom floor and installed L.G. brackets |
3.5 |
fuselage |
|
DETAIL: |
|||
|
I finished up the floor. I used a bearing flush cutter and router to trim off the extra material from the bottom. After that I pulled out my right side landing gear brackets. I bolted them to the landing gear vee and then placed the assembly onto the fuse. The holes didn't quite line up with the longerons like they should so I put some filler blocks in the areas that needed more edge clearance. I ordered some .75" x 1.25" .125 thickness 4130 rectangular bar that I'll use for the spreader bars. Won't be able to do any more work on the landing gear until it arrives. I also put another 2 coats of spar varnish in the cockpit area. I'm sanding between coats with 120 grit paper. I now have 4 coats of varnish inside and it's looking very nice! Like a fine piece of furniture. I had originally intended on painting the interior a medium gray, but after seeing the wood glossed up with spar varnish, I just have to leave it alone.
|
|||
| PICTURES: | |||
|
|
|||
| BACK TO LOG | |||