CONSTRUCTION LOG  PAGE 4 of 4                                PAGE   1  2  3  4

DATE

PROCESS

HOURS

CATEGORY

03/08/04

Tailwheel control cables & retractable boarding step

4.0

fuselage

03/13/04

4130 steel lift strut ends (for SkyTek aluminum struts)

6.0

wings

03/14/04

Seatbelt installation

2.0

fuselage

03/15/04

Wings installed onto fuse!

5.0

??????

03/25/04

Front cockpit throttle control & other misc stuff

6.0

fuselage

03/28/04

Passenger door & rudder cable Delrin rubbing blocks

4.0

fuselage

03/29/04

Made brake lines, installed and filled with fluid

3.0

fuselage

04/24/04

Revised Sentra rear starter mounts

4.0

engine

04/26/04

John Deere Dynamo installation

3.0

engine

05/02/04

Intake system & Carb/Carb Heat Box installed

10.0

engine

05/14/04

Spinner installed

3.0

engine

08/26/04

Carb Heat cable, Mixture Bellcrank, Oil Filter

4.0

engine

09/01/04

Instrument Panel

4.0

fuselage

09/05/04

Electrical Wiring

9.0

fuselage

09/18/04

Misc. Firewall Forward stuff

8.0

fuselage

10/11/04

Firewall Forward is complete!

10.0

fuselage

02/12/05

Vertical Stab. & Rudder covering

5.0

covering

02/19/05

Elevator Covering

4.0

covering

05/12/05

R.J. Grega releases new CAD drawn GN-1 plans!

---

----

08/23/06
Yes! I still exist! the project is still underway
---
----
 
       
       
       
       
       

                                                                                               

 

-