Questions / Comments?    email me at   djv@imagedv.com

CONSTRUCTION LOG  PAGE 3 of 4                                PAGE   1  2  3  4

DATE

PROCESS

HOURS

CATEGORY

03/20/03

Front Panel, Firewall & Fuselage Combing

4.0

fuselage

03/25/03

Brakes installed

3.0

fuselage

03/30/03

Cabanes and more combing work

7.0

fuselage

06/10/03

Lasercut 4140 steel fittings

6.0

wing

07/04/03

Wing Center Section & Cabanes

10.0

wing

07/10/03

Corvair Top Covers received from EmachineShop.com

1.0

engine

 07/19/03

A couple pictures of N74DV as of 07-2003

0.0

 -----------

09/13/03

Corvair engine work

1.5

engine

09/20/03

Corvair heads/intake tubes

.5

engine

10/05/03

Corvair Assembly !!!!!

15.0

engine

10/20/03

Corvair oil cooler-filter mods

2.0

engine

10/22/03

Corvair - more assembly - cylinders/pistons

3.0

engine

10/25/03

Corvair test stand assembly

4.0

engine

10/28/03

Corvair Rear Starter mounting

3.0

engine

11/01/03

Corvair engine mounted to the test stand

3.0

engine

11/07/03

Corvair engine - FIRST RUN!

8.0

engine

11/22/03

Corvair engine - relocated carb and test run

3.0

engine

01/10/04

Wing Center Section plywood skinning

4.5

wing

01/21/04

Elevator/Rudder Controls

25.0

fuselage

01/26/04

Center Section rigging &  "flop"

8.0

wing

01/31/04

A couple pictures of N74DV as of 01-2004

0.0

-----------

02/05/04

Corvair engine mount "Spools" &  "Tray"

3.0

engine

02/16/04

Corvair engine mount

9.0

engine

02/24/04

Fuselage Side Stringer & Fabric contour filler blocks (left side)

4.0

fuselage

03/02/04

Pictures of my newly acquired pre-built wings

----

----------

03/02/04

Pictures of my newly acquired GN-1 Fuse/Tail

----

----------

                                             MORE ENTRIES ON PAGE 4 >>

-